THE PROJECT COMPRISED OF THE REFURBISHMENT OF THE SECOND FLOOR LEVEL OF AN EXISTING OFFICE BUILDING.
The floor refurbishment was carried out on a vacant floor within an occupied office building in the heart of London.
The refurbishment comprised of all M&E, lights and air conditioning by using a multiservice chilled beam system which integrated the A/C, sprinkler pipework and lights into one unit. The works included new windows and the upgrade of the toilet and lobby areas, including new lift doors and surrounds.
Due to the works being carried during the working day, regular meetings with representatives from the adjacent floors, above and below, met to discuss issues and forthcoming works with our site team and contracts managers to limit unnecessary disruption.
Key features of the project were:
- Refurbished to a Category A standard
- Multi service chilled beams
- Raised access floors
- Regular meetings with adjacent floor representatives