THE PROJECT COMPRISED OF THE CONSTRUCTION OF A NEW WAREHOUSE AND PRODUCTION BUILDING WITH AN ATTACHED TWO STOREY OFFICE AND STAFF AMENITY BUILDING. THE PROJECT WAS PROCURED VIA A SINGLE SOURCE NEGOTIATION ROUTE
The warehouse and production building was constructed using a single storey steel framed structure and the office building was constructed using a two storey steel frame structure with a composite steel deck first floor slab. The envelope of both buildings were clad with insulated roof and wall cladding. Aluminium windows, curtain walling and entrance doors were provided to the office area and specialist industrial doors and loading equipment were installed within the warehouse. The project included the construction of the external car parking and paved areas, landscaping, security installations, drainage and services
Key features of the project were:-
- Steel framed structure
- Industrial doors and loading bay equipment installations
- Aluminium windows and curtain walling installation
- Negotiated procurement route