THE PROJECT COMPRISED ON THE CONSTRUCTION OF A TWO STOREY SIXTH FORM BLOCK REQUIRED IN ORDER TO CATER FOR AN INCREASE IN THE SIXTH FORM INTAKE OF 200 PUPILS PER YEAR GROUP. THE PROJECT WAS PROCURED VIA AN NEC PARTNERING FORM OF CONTRACT

The two storey building was constructed using a steel frame structure with a composite steel and concrete first floor slab and steel staircases. The roof finish comprised of a standing seam steel roof cladding system and externally, the building envelope was formed using a render finished blockwork cavity wall construction with aluminium windows and doors.

Key features of the project were:-

  • Steel frame structure
  • Standing seam roof finish
  • Project undertaken within an¬†operational school site
  • Partnering project using NEC Form of Contract
  • Project delivered within budget and to programme
  • Farlingaye High School, 6th Form, Woodbridge
  • Farlingaye High School, 6th Form, Woodbridge
Client:
Suffolk County Council
Duration:
32
Completion Date:
September 2006

Want to know more

If you are interested in how we can work with you please do get in touch.
owl@barnesconstruction.co.uk

Contact Us

6 Bermuda Road
Ransomes Europark
Ipswich
Suffolk
IP3 9RU

Twitter

Accreditations

NHBC Logo CHAS Logo CIOB Logo Exor Logo Construction Online Logo NFB Logo BSI Logo TFG Logo
Copyright © 2017 - 2018 Barnes Construction   |   All Rights Reserved   |   Web design agency - Integrated Ideas