Graduate Accommodation, Leckhampton, Grange Road, Cambridge

THE PROJECT COMPRISED OF THE CONSTRUCTION OF A FOUR STOREY GRADUATE ACCOMMODATION BLOCK INCORPORATING 40 STUDY BEDROOMS. THE PROJECT WAS PROCURED VIA A TWO STAGE DESIGN AND CONSTRUCT PROCUREMENT PROCESS

The new four storey building was constructed using a reinforced concrete frame structure with a light weight roof level plant room and roof terrace enclosure. The roof was finished with a single ply roofing membrane with pedestrian pavings and glazed balustrades to the roof level terrace area. The external building envelope was formed with a combination of facing brickwork, aluminium frameless windows, curtain walling and brise soleil.

Internally, the building has been finished to a high standard with the use of high quality materials including en suite shower facilities, fixed desk and study furniture and communal kitchen areas.

Key features of the project were:-

  • Project undertaken adjacent to occupied accommodation
  • Four storey concrete frame structure
  • Complex frameless glazing and brise soleil installation
  • Gas fired air source heat pumps installed
  • Two Stage Design and Construct Procurement
  • Graduate Accommodation, Corpus Christi, Cambridge
  • Graduate Accommodation, Corpus Christi, Cambridge
  • Graduate Accommodation, Corpus Christi, Cambridge
  • Graduate Accommodation, Corpus Christi, Cambridge
Client:
Corpus Christi College
Duration:
48
Completion Date:
June 2012

Want to know more

If you are interested in how we can work with you please do get in touch.
owl@barnesconstruction.co.uk

Contact Us

6 Bermuda Road
Ransomes Europark
Ipswich
Suffolk
IP3 9RU

Twitter

Accreditations

NHBC Logo CHAS Logo CIOB Logo Exor Logo Construction Online Logo NFB Logo BSI Logo TFG Logo
Copyright © 2017 - 2018 Barnes Construction   |   All Rights Reserved   |   Web design agency - Integrated Ideas